•  
  •  
 

Abstract or Description

With the recent construction of Colby Green and the current plans for the construction of several new buildings, the total area for future development on campus has declined. The goal of this study was to illustrate existing campus development and to determine where future growth could occur. GIS was used to in determining the different soil systems on campus, the current use of the land, and the boundaries of the Colby property. The project shows what potential obstacles the college will have in attempting to expand the campus and proposes where the best options are for construction are.

Rights

In Copyright

Share

COinS
 
 

To view the content in your browser, please download Adobe Reader or, alternately,
you may Download the file to your hard drive.

NOTE: The latest versions of Adobe Reader do not support viewing PDF files within Firefox on Mac OS and if you are using a modern (Intel) Mac, there is no official plugin for viewing PDF files within the browser window.