•  
  •  
 

Abstract or Description

This project analyzes woodlot feasibility in providing fuel for the biomass facility being built at Colby College in the spring of 2012. The demand for fuel is estimated at 22,000 tons of wood chips annually, fluctuating monthly due to consumption needs. This project identifies the most feasible woodlots for supplying Colby College based on size and distance from the plant. Categorized, the ranking of woodlots may be applied to decisions about where to get fuel as demand rises. Minimum and maximum thresholds can be derived and scaled based on demand.

About the Author

Theo is an Environmental Studies major with a policy concentration.

Rights

In Copyright

Share

COinS
 
 

To view the content in your browser, please download Adobe Reader or, alternately,
you may Download the file to your hard drive.

NOTE: The latest versions of Adobe Reader do not support viewing PDF files within Firefox on Mac OS and if you are using a modern (Intel) Mac, there is no official plugin for viewing PDF files within the browser window.